The Second Stage Expressway System (SES) in Bangkok Case Solution
Abstract:
The Second Stage Expressway System (SES) was developed to broaden the capability of the existing expressway system so as to eliminate the traffic pressure in the Bangkok city location. It was the very first facilities task in Thailand constructed on a Build, Operate, and Transfer (BOT) basis, and is related to as a test case for BOT probabilities all over the area.
Pedagogical Goals:
To draw the lessons of the SES circumstance for the different gamers, and to highlight the ramifications for the different gamers in dealing with future offers.
This is just an excerpt. This case is about Strategy
published: 01 Jan 1995