CONSTRUCTING THE MEDUPI POWER STATION CASE STUDIES Introduction Medupi, ascending from the “dry Limpopo shrubbery steppes”, was the primary venture of base burden is inherent South Africa in 20 years. This will be the biggest dry-cooled coal-ended power on the planet, and was planned by “Eskom”, which creates 90% of limit in southern Africa, the […]