What is constructed

The construction project has been made to construct the five main areas in the building, which are as follows:

  • Up-gradation of the external facade to a double-skin facade,in order to achieve the better user comfort, with an inclusion of the the energy efficient and ease of maintainability, which also uses the lower-solar heat glass for the windows openings.
  • Along with that, the installation of the water drainage system needs to be constructed, in order to reduce the potential impact related to the current development of the surface water drainage discharge.
  • In addition to this, the fire exit strategy has been developed in order to exit the building in the emergency that may be due to a fire and any other natural disaster.
  • Furthermore, the construction is required to be done for the installation of the ventilator system in the building, in order to cross the air that will not create the gas within the building which tends to lead towards the fire ignition, which will create damages to the building.
  • At last, the conference room is required to be constructed on the first floor of the building.

Issues and Potential Delays

There are several issues and potential delays that have been observed during the life of the construction project, which are mentioned below:(Michael Page, 2018)

  • Inadequate risk management, which is mostly used by the project managers in order to remove the long-term issues from the construction plan, but sometimes it might be irrelevant and not related to the construction management.
  • In addition to this, the potential issue during the construction project which might lead towards the potential delays is the natural disasters, such as: the earthquake, weather uncertainty etc.
  • Furthermore, the waste of the construction project might also lead to the issues and potential delays for the building construction.
  • In addition to this, the skilled workers unavailability might lead towards some issues and potential delays for the building construction.
  • Furthermore, the construction noise might lead to the issues and potential delays for the building construction, because the noise is considered as the environmental pollution.
  • At last, the poor communication with the workers working at the basic level, might lead towards some issues and potential delays in the building’s construction.

Suggested Recovery Strategy

To ensure the safety of construction workers; proper tools and materials should be provided. The scaffold should be stable enough to hold the labor and the weight which the workers would carry. The medical team should be available on-site, to cater to any injured worker.  Mask should be provided to the workers using concrete, to avoid any health issues. To avoid construction waste; a proper waste management plan is needed. The waste disposal methodology should be clearly mentioned in the plan. The project management plan should also be consisted of a disaster recovery plan.

To protect the structure or workers from a natural disaster or uncertain whether; proper precautionary measures should be planned, beforehand. Concrete or other material if possible, should be crushed and recycled.To avoid the noise during the construction; a meter should be installed to ensure that the noise does not exceed the defined limits set by the National Environment Agency. Any sort of change in the design due to the site constraints or delays in obtaining the required materials, must be reported to avoid delays. Frequent site surveys should be planned, to overlook the entire construction process. Any material that is to be used during construction, should be studied beforehand. Backup workers should be available, so in the case of one worker, absence wouldn’t affect the overall construction....................

This is just a sample partial case solution. Please place the order on the website to order your own originally done case solution.