ABC Shipyard: The Facility Layout Case Solution
The shipyard might produce the ships, however with its existing layout and throughput, the ships might not be finished within the asked for two-year shipment time. A modular technique was essential to develop complicated and big items such as ships, making complex the needed circulation of product in between the stores and impacting the spatial resources required. Could ABC Shipyard's existing facility layout be enhanced, and would the modification boost throughput, permitting the brand-new ships to be constructed within the needed 2 years?
This is just an excerpt. This case is about TECHNOLOGY & OPERATIONS
PUBLICATION DATE: November 29, 2016