Benchmarking at Uljanik Shipyard Harvard Case Solution & Analysis

Junior executive tasked with calculating the overall tests in shipbuilding - the price per tonne of gross compensation. Although the raw data for its components, the executive must articulate the relationship between the data for the determination of the standard. Case is designed to: 1) an introduction to the construction and use of criteria of quality control, 2) practice in conceptualizing the problem and develop the basic model of the table to solve the problem. The modeling procedure uses a scheme of influence as the basis for constructing a model of tables, the table model is available, the product 7B05D011. "Hide
by David Curry, Giorgio Sinkovic Source: Richard Ivey School of Business Foundation 5 pages. Publication Date: April 26, 2005. Prod. #: 905D11-PDF-ENG

Share This

SALE SALE

Save Up To

30%

IN ONLINE CASE STUDY

FOR FREE CASES AND PROJECTS INCLUDING EXCITING DEALS PLEASE REGISTER YOURSELF !!

Register now and save up to 30%.