Three examples of the analysis of the potential available. Calculating the cycle time, production timing, power, labor cost, labor and the use made of three different types of processes: the bread-making process with two independent lines, croissant-making process involving two dependent parallel lines, one for the preparation of the test and one to mix the filling and assembly automotive components operations. The impact of the imbalance, the reliability of the machine, as well as planning for the existing capacities shown. "Hide
by Anne E. Gray, James Leonard 8 pages. Publication Date: August 28, 1995. Prod. #: 696058-PDF-ENG